Toilet (WC) (proper size for the number of working staff)
Storage room
Note for interior design
All mentioned above or more, participant in the construction of in-exterior shall suggest design at your
discretion and by efficiently arranging it in the layout and please refer to current CAP branch design
and layout etc.
The wall at ground floor, wall and veranda at mezzanine floor as attached layout shall be demolished.
Counters face to the entrance door.
Submission 3D design at your discretion and suggestion to improve branding.
Water proof of any places inside the bank in order to protect all equipment shall be required.
Quotation including M&E (Reference to specification of Layout) shall be submitted.
Quotation of network and telephone shall be submitted separately by attaching company profile including
specific network and telephone, vendor name and contact information.
EXTERIOR WORKS
ATM Booth (2 ATMs)
Quotation of network and telephone shall be submitted separately by attaching company profile including
specific
network and telephone, vendor name and contact information.
Exterior Coverage (it must specify the place of production of the material)
Toilet (WC) for security guards
Parking lot in front the building (demolishing front part of current building)
Water proof and make zinc roof shall be required for any places to protect leaking from raining, in
terms of
roof
with proper water way.
Generator room at proper place including electricity connection works.
NOTE FOR EXTERIOR DESIGN
Submission 3D design at your discretion based on any suggestion to improve branding image.
Note:Please refer to PPCBank design of current branches
design.
SUBMISSION DEADLINE FOR APPLICATION
Friday, 26th Janurary 2024 (11:00 AM)
HOW TO SUBMIT YOUR APPLICATION
Application documents shall be submitted to Administrative Department of PPCBank
Application documents shall be enclosed with the company seal.
APPLICATION DOCUMENTS
Company introduction including such as company name, establishment year, capital, total assets, previous
year’s
net profit, number of employees, major business field, representative nationality
APPLICANT QUALIFICATION
Company related to the construction of interior and exterior that registered business in Cambodia
DECISION-MAKING METHOD OF COMPANY
Decisions according to the bank’s internal regulations.
APPLICANT DEPOSIT
None
RESULT NOTIFICATION DATE
PPCBank will notify on proper date before construction.
SIGNING OF CONTRACT FOR CONSTRUCTION
Within 10 days from the date of notification of the result
WHO TO NOTED WHEN SUBMITTING YOUR APPLICATION
Identify guidelines, regulations, special conditions, etc. of local authority in relation to facility
construction
Inspection procedure will be carried out after completion of construction
If you have any concern, please feel free to contact us.